Sidewalk Replacement Protocol

The City of Winona has been divided into sections to incorporate a maintenance program for the replacement of hazardous sidewalks within the city. The city-wide sidewalk replacement map displays these 12 sections.

  1. Irrigation Systems
  2. Approved Sidewalk Repair Methods
  3. Sidewalk Replacement Protocol - Guidelines

Those properties with irrigation systems within the right-of-way would be advised to make repairs themselves or hire a contractor. If any sidewalk or curb replacement is to be completed under the City of Winona’s sidewalk replacement project, any damage caused to the irrigation system will be at the owner’s expense. It is advised that if the property owner has the concrete work completed by the City, that they have the entire irrigation system within the right-of-way exposed by May 1st, for a sidewalk replacement start date of mid-May.